   Project life cycle    Shutdown    EET earliest event time    Scope    Milestones    SMAC site man-hours and cost    estimated cost    host organization    budgetary control    hierarchy of networks    incurred costs    resource levelling    project diary    Project management process    IA investment appraisal    Handover    Development    QMS quality management system    risk sharing    TDR test discount rate    contracting-out    actual costs    ETA elemental trend analysis    indirect cost    QP quality plan    risk identification    backward pass    project champion    PMP project management plan    lead    cost breakdown structure    project network techniques    risk management    latest start time    latest event time    project    post-implementation report    direct cost    risk response    VE value engineering    unlimited schedule    Task    WP work package    TQM total quality management    float    Phases    Installation.    Implementation    master network    Conception    end event    loop    CM configuration management    PDM precedence diagram method    network interface    DCF discounted cash flow    final report    Plan    CDR critical design review    Operation    acceptance test    deliverables    In-service    LOB line of balance    network    acceptance criteria    audit    realistic, time-bound    performance specification    VM value management    RFQ request for quotation    GPV gross present value    Activity    internal rate of return    exception report    RR rate of return    EVM earned value management    project log    project schedule    PDS post-design services    LST latest start time    Life cycle    dummy activity    DDP delivery duty paid    Authorization    AOA activity-on-arrow    TF total float    RIRO rubbish in ± rubbish out    PM project manager    project support staff    AON activity-on-node    Initiation    line of balance network    cascade chart    forward pass    RFP request for proposals    LFT latest finish time    simulation    issues    transfer of risk    TOR terms of reference    project progress report    event    resource allocation    EVA earned value analysis    resource limited scheduling    project closure    start event    EST earliest start time    LCC life cycle costing    change control    PDR preliminary design review    network analysis    parallel line method    CPM critical path methods    accrued costs    SDR system design review    Phase    resource aggregation    WLC whole life cost(-ing)    risk quantification    Research    project brief    ROI return on investment    baseline    buffer time    contingency plan    project coordination    line of balance diagram    RFI request for information    net cash flow    CPI cost performance index    cost centre    BC business case    risk evaluation    capital cost    NDT non-destructive testing    fast-tracking    feasibility study    capital employed    probabilistic network    Evaluation    LET latest event time    VA value analysis    resource    Matrix Organisation    CBA cost-benefit analysis    dependency arrow    stage payment    cumulative cost of work

Castlebar Management Services Limited (CMSL) specialises in the discipline of Programme and Project Management and the implementation of business control processes.

Programme and project management disciplines are transferable between industries and CMSL’s services have been utilised within the following sectors:
  • Construction
  • Banking
  • Transportation
  • Air Traffic Control
  • IT/IS

    CMSL uses its considerable experience to adapt recognised programme/project management methodologies to suit each clients needs. Clients that utilise CMSL’s experience reduce the risk that programmes/projects are late, over budget and below standard.

    CMSL:
  • Undertake investigations and studies
  • Establish Programme/Project Support Offices
  • Provide resources to work within programmes/projects either on an interim or longer term basis
  • Design and implement business control processes